Work continues to progress on the branch. On the addition, the floor has been poured, demo has been done to prepare the old roof to meet the new, and ceiling framework has gone up. Inside, framing continued, data and electrical lines have been run through the open walls and ceilings, and drywalling has begun. A trench has been dug to house electrical lines that will run to floor outlets near study tables.
|
Trenches in floor to run electric to tables |
|
View from the front door into the circulation area |
|
|
View towards the children's room |
|
Interior staff space taking shape |